| THC 23B-1 Switch and Outlet Boxes | |
|---|---|
| CHAIR Mr. Guy Benjamin Thomas & Betts, A Member of the ABB Group 1811 Boul Hymus Dorval, QC H9P 1J5 Canada Phone: (514) 685-2277 x7561 Email: guy.benjamin@tnb.com | SECRETARY Daniel Abbate NEMA 1812 N. Moore Street, Suite 2200 Arlington VA 22209 USA Phone: (703) 859-0193 Fax: (703) 841-3388 Email: daniel.abbate@nema.org |
SCOPE
| STANDARDS
|
| PROJECTS 9. Metallic Outlet Boxes 101. Integration of North American box requirements in IEC 60670-1 Second amendment cycle for the tri-national standard for metallic outlet boxes Third amendment cycle for the tri-national standard for metallic outlet boxes Fourth amendment cycle for the tri-national standard for metallic outlet boxes XX. Fifth amendment cycle for the tri-national standard for metallic Outlet Boxes | |
| Publication Schedules CANENA-Project-Tracker-Metal-Box-Standard 2016-2018CANENA-Project-Tracker-Metal-Box-Standard – UL 514A/CSA C22.2 NO 18.1/NMX-J-023/1-ANCE (2019) CANENA-Project-Tracker-Metal-Box-Standard – UL 514A/CSA C22.2 NO 18.1/NMX-J-023/1-ANCE (2024) | |

